Our Company
Since 1995, Coastal Power Systems has helped organizations build, maintain, modernize, and support the electrical power systems that keep critical facilities operating safely and reliably. What began as a trusted source for industrial circuit breakers has grown into a full-service provider of engineering, manufacturing, testing, commissioning, maintenance, modernization, emergency response, and lifecycle support for electrical power distribution systems.
Today, CPS serves customers throughout the United States from our manufacturing and service facilities in the Houston, Texas metropolitan area. Our customers include utilities, data centers, power generation facilities, oil and gas operations, petrochemical plants, industrial manufacturers, water and wastewater facilities, transportation infrastructure, commercial facilities, and other organizations where electrical reliability is essential to daily operations.
Our mission is to deliver dependable, responsive, and practical power solutions that improve reliability, reduce downtime, and support the long-term performance of critical electrical infrastructure.
Unlike companies that focus on only one aspect of the power system lifecycle, Coastal Power Systems combines engineering, manufacturing, field services, testing, repair, modernization, and technical support within a single organization. This integrated approach allows customers to work with one experienced partner from initial design and equipment selection through commissioning, maintenance, modernization, emergency response, and long-term asset management.
What Coastal Power Systems Does
Coastal Power Systems is an engineering-driven manufacturer of critical electrical infrastructure. We deliver complete electrical infrastructure lifecycle solutions—from concept and design, through manufacturing, commissioning, testing, modernization, maintenance, and emergency response. We partner with EPCs, industrial facilities, and mission-critical operators to reduce risk, improve power reliability, and simplify project execution.
Engineering Practical Solutions
Every electrical system presents unique operational requirements, equipment configurations, maintenance challenges, and reliability objectives. Coastal Power Systems works closely with customers to evaluate existing infrastructure, identify practical improvement opportunities, and develop solutions that balance performance, safety, outage constraints, and long-term asset value. Whether supplying new electrical distribution equipment, modernizing aging switchgear, performing commissioning and acceptance testing, restoring obsolete circuit breakers, or responding to emergency failures, our objective remains the same: deliver technically sound solutions that improve reliability while minimizing operational risk.
Supporting Critical Infrastructure
Electrical power systems are fundamental to nearly every industrial and commercial operation. A single equipment failure can interrupt production, affect safety, delay operations, or result in significant financial loss. Coastal Power Systems helps customers reduce those risks through responsive service, experienced technical support, and practical engineering solutions designed to keep critical electrical infrastructure operating reliably. Whether your project involves a single circuit breaker, a custom-engineered switchboard, a complete power system modernization, or ongoing maintenance and testing, CPS provides the expertise, resources, and experience to support your electrical infrastructure throughout its entire lifecycle.
Built for Critical Electrical Infrastructure
Power distribution systems are not generic assets. They are engineered, installed, maintained, and modernized around real operating conditions, available space, equipment age, load requirements, safety standards, outage windows, and long-term reliability goals. Coastal Power Systems helps customers address those issues with a combination of equipment knowledge, field experience, and practical engineering judgment.
Our team supports both planned projects and urgent equipment needs. That may include supplying new switchgear or switchboards, supporting a commissioning plan, performing electrical testing, helping extend the life of aging equipment, or responding when a critical electrical component has failed. The goal is always the same: reduce risk, support uptime, and provide a technically sound path forward.
Engineering & Design
Technical support for equipment selection, system evaluation, project planning, modernization needs, and power distribution reliability decisions.
Manufacturing
Custom power distribution equipment for industrial, utility, commercial, and mission-critical applications, including switchgear, switchboards, panelboards, and related assemblies.
Testing & Commissioning
Field testing and commissioning support to verify equipment condition, confirm performance, identify risk, and support safe energization.
Maintenance & Reliability
Preventive maintenance, infrared inspections, equipment assessments, and reliability-focused service for electrical distribution systems.
Modernization & Life Expansion
Retrofits, upgrades, replacement planning, and life extension support for aging power distribution equipment.
Emergency Response
Responsive support for urgent equipment failures, replacement needs, outage recovery, and critical power restoration situations.
Industries We Serve

Our Practical Approach
Coastal Power Systems focuses on practical, technically sound solutions rather than one-size-fits-all recommendations. Every facility has different operating demands, equipment constraints, outage limitations, and risk tolerance. A reliable recommendation must consider the condition of the existing system, the load served, the available installation window, applicable standards, equipment lead times, and the customer’s operational priorities.
This approach is especially important when customers are dealing with aging switchgear, obsolete breakers, coordination concerns, limited documentation, emergency replacement needs, or equipment that cannot easily be taken out of service. Coastal Power Systems helps customers understand the available options so they can make informed decisions about repair, replacement, modernization, testing, or long-term reliability planning.
Why Customers Work With Coastal Power Systems
Lifecycle Support
Support for manufacturing, engineering, commissioning, testing, maintenance, modernization, and emergency response.
Technical Experience
Practical knowledge of electrical distribution equipment, field conditions, reliability issues, and facility power requirements.
Responsive Problem Solving
Support for both planned projects and urgent electrical equipment problems where response time and technical judgment matter.
Supporting Safer, More Reliable Power Distribution
Electrical infrastructure reliability depends on more than equipment alone. It requires proper design, correct application, quality manufacturing, accurate testing, disciplined maintenance, and informed modernization decisions over time. Coastal Power Systems supports those needs with services that help customers reduce risk, improve visibility into equipment condition, and make better decisions about critical power assets.
Whether the need is a new electrical distribution assembly, preventive maintenance program, commissioning support, breaker replacement, infrared inspection, modernization project, or emergency response, Coastal Power Systems helps customers move from problem identification to practical execution.
Need Support for Critical Power Equipment?
Coastal Power Systems can help you evaluate your electrical distribution needs, plan equipment replacement or modernization, support commissioning, improve reliability, or respond to urgent power system issues.
Meet Our Technical Team
Coastal Power Systems is led by experienced professionals with extensive backgrounds in electrical power systems, equipment manufacturing, engineering, operations, project development, and technical sales. Their combined experience helps CPS deliver practical solutions for industrial, utility, power generation, data center, renewable energy, and critical infrastructure applications.
Michael Davis
President and CEO
Michael Davis has more than 18 years of experience with Coastal Power Systems and leads the company’s continued growth as President and CEO. His experience includes innovative retrofit designs, circuit breaker and motor control center repairs, equipment sales, switchboards, switchgear, and custom-built electrical equipment.
Michael focuses on maintaining CPS’s reputation for quality, reliability, integrity, and technical ingenuity. Under his leadership, CPS continues to advance its manufacturing and modernization capabilities, including UL 891-certified switchboard production and partnerships supporting CPSafe UL 1558 switchgear.
Larry Lovelace
Technical Partner
Larry Lovelace is an experienced technical and business leader with a demonstrated history in the electrical and electronic manufacturing industry. His areas of expertise include operations management, power plants, supervisory control and data acquisition systems, electric power systems, and electrical wiring.
Larry brings a combination of technical knowledge, operational experience, and entrepreneurial leadership to Coastal Power Systems. He holds a master’s degree in business administration from the University of Phoenix.
Wade Dinwiddie
Vice President of Sales & Marketing
Wade Dinwiddie is an electrical industry executive with more than 25 years of experience leading sales growth, business operations, strategic market expansion, and large-scale project development.
His experience spans the power generation, industrial, utility, renewable energy, and data center sectors. Wade works closely with customers and the CPS technical team to identify project requirements, develop practical solutions, and support long-term customer relationships.
Frequently Asked Questions
What does Coastal Power Systems do?
Coastal Power Systems provides power distribution equipment, engineering support, testing, commissioning, maintenance, modernization, and emergency response services for industrial, utility, commercial, and mission-critical facilities.
The company supports customers across the electrical infrastructure lifecycle, from new equipment needs and system planning to field testing, preventive maintenance, reliability improvement, equipment upgrades, and urgent response when critical power equipment fails.
What types of facilities does Coastal Power Systems serve?
Coastal Power Systems serves data centers, utilities, power generation facilities, oil and gas operations, petrochemical plants, industrial manufacturing facilities, municipal infrastructure, water and wastewater plants, transportation infrastructure, and other facilities with critical power distribution needs.
These facilities often require dependable electrical infrastructure, coordinated project support, safe equipment operation, and responsive service because downtime can affect production, public services, safety, revenue, and operational continuity.
Can Coastal Power Systems help with aging electrical equipment?
Yes. Coastal Power Systems supports equipment assessments, modernization planning, retrofits, replacement equipment, preventive maintenance, and life extension strategies for aging electrical distribution systems.
Aging electrical equipment often creates reliability, safety, maintenance, and replacement challenges. Coastal Power Systems helps customers evaluate whether equipment should be maintained, repaired, retrofitted, upgraded, or replaced based on condition, application, risk, and operational requirements.
Does Coastal Power Systems provide emergency response?
Yes. Coastal Power Systems provides emergency response support for urgent electrical equipment failures, replacement needs, outage recovery, and critical power restoration situations.
Emergency response may involve evaluating failed equipment, identifying replacement options, supporting temporary or permanent restoration plans, coordinating with facility teams, and helping reduce downtime when electrical infrastructure is affecting operations.
Why choose a company that supports manufacturing, engineering, testing, maintenance, and modernization?
Electrical infrastructure decisions are connected. Equipment design affects commissioning, testing results influence maintenance, engineering studies guide modernization, and emergency repairs can affect long-term reliability.
Working with a company that understands the full electrical asset lifecycle can reduce knowledge gaps, improve coordination, and support better technical decisions. This is especially valuable when facilities are managing aging equipment, tight outage windows, complex power distribution systems, or critical operations that cannot tolerate unnecessary downtime.
Find Careers at CPS >> Job Postings